EQUIPMENT DETAILS COOLING TOWERS Daily PREVENTIVE MAINTENANCE

Mannan

Administrator
Staff member
#1


proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D3&hash=ae866cb1b633706ea853d3841bcbc208


proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D4&hash=b63a662fc34192936ec29f3cd1a1fec2



الحمد لله والصلاة والسلام على رسول الله وعلى آله وصحبه أجمعين



EQUIPMENT DETAILS COOLING TOWERS Daily PREVENTIVE MAINTENANCE


SCHEDULE OF PLANNED PREVENTIVE MAINTENANCE Work Plan


SCHEDULES OF PLANNED PREVENTATIVE MAINTENANCE Work Plan


proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D140&hash=4d55591467a4e1f8359795656105890d


EQUIPMENT DETAILS COOLING TOWERS Dailyl PREVENTIVE MAINTENANCE

صيانة دورية جداول جاهزة نظام بوابات الدخول المؤمنة

جاهزة للتحميل و سهلة التعديل و الطباعة مايكروسوفت وورد ملفات

EASY AND READY TO BE DOWNLOADED , MODIFIED AND PRINTED

MICROSOFT WORD DOCUMENTS TECHNICAL DATA SCHEDULES

Capacity
Qty: Lot
Make & Model

Location
COOLING TOWERS Daily PREVENTIVE MAINTENANCE


Task Description
W / Weekly M / Monthly Q / Quarterly SA/ Semi/Annually
A/ Annually SST / Seasonal Start/Up SSH / Season Shut Down
2W M 3M
6M A Notes

Item Description
Qty Notes

Critical Tasks to be performed

Check and record Water level in the sump
Check and record Water meter reading
Check and record Fan motor voltage and ampere
Check and record Ambient temperatures. DB & WB
Check Operation of the float valve
Check Over-flow
Check Blow down valve
Check Motor temperature by feeling with hand, if possible

Other recommended tasks

Blow down to be carried out as recommended by Laboratory
Daily chemical dosage to be added / operation of chemical treatment and bleeding units
Inspect for undue noise or vibration and any evidence of water leakage

Notes
Use additional sheets if required
PPM routines based on Complete
Running hour where recommended by the Manufacturer


proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D6&hash=e694c7d9a3c445d7e5187539c644951d


http://www.sitei.net/up/do.php?id=139

or you can download from attachments