EQUIPMENT DETAILS Water Booster pump

Mannan

Administrator
Staff member
#1


proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D3&hash=ae866cb1b633706ea853d3841bcbc208


proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D4&hash=b63a662fc34192936ec29f3cd1a1fec2



الحمد لله والصلاة والسلام على رسول الله وعلى آله وصحبه أجمعين


EQUIPMENT DETAILS Water Booster pump

SCHEDULE OF PLANNED PREVENTIVE MAINTENANCE Work Plan


proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D56&hash=100f89295ad46c8c2c91c0c8ce936503


EQUIPMENT DETAILS Water Booster pump

صيانة دورية جداول جاهزة نظام مضخة زيادة ضغط الماء

Capacity
Qty: Lot
Make & Model

Location

Smoke Fan

Water Booster pump

Task Description
W / Weekly M / Monthly Q / Quarterly SA/ Semi/Annually
A/ Annually SST / Seasonal Start/Up SSH / Season Shut Down
2W M 3M
6M A Notes

Item Description
Qty Notes

Critical Tasks
Operate manually all pumps
Examine water and air pressure gauge
Check all valves for free travel
Test audible alarm
Check glands for leaks if necessary tighten
Inspect unit for unusual noise and/or vibration, ensure that it is in good working order.
Provide lubrication, if necessary.
If unit is not running or an identified problem requires the unit to be serviced, perform ALL Non-
Critical Tasks listed below.

Flush and clean strainers.
Check operation of gauges and record pressures and temperatures.
Inspect seals and packing, tighten or replace as necessary.
Lubricate impeller shaft bearings.
Inspect motor and pump alignment.
Other recommended tasks
Inspect mounting bolts and vibration isolators of the pump under load conditions.
Start and stop pump, noting any vibration and overall performance.
Inspect drive shaft coupling.
Operate manually all pumps

Check all valves for free travel
Examine water and air pressure gauge
Test audible alarm
Check glands for leaks if necessary tighten
Clean all strainers
Examine pipe work & connection for leak
Lubricate all bearings
Blowout all dust from control panel, pump and
motor
Check alignment ( coupling )
Check all operating control if necessary adjust
Check for necessary paint


Notes
Use additional sheets if required
PPM routines based on Complete
Running hour where recommended by the Manufacturer


proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D6&hash=e694c7d9a3c445d7e5187539c644951d


http://www.sitei.net/up/do.php?id=57


في أمان الله !


proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D5&hash=acaedc343055116a139b8f0cbf6d6ab6


 

Attachments

Top