الحمد لله والصلاة والسلام على رسول الله وعلى آله وصحبه أجمعين
EQUIPMENT DETAILS FM 200 SYSTEM
SCHEDULE OF PLANNED PREVENTIVE MAINTENANCE Work Plan
EQUIPMENT DETAILS FM 200 SYSTEM
صيانة دورية جداول جاهزة نظام غاز اف ام مئتين مكافحة الحريق
Capacity
Qty: Lot
Make & Model
Location
FM 200 SYSTEM
Consumable Spare Parts
Task Description
W / Weekly M / Monthly Q / Quarterly SA/ Semi/Annually
A/ Annually SST / Seasonal Start/Up SSH / Season Shut Down
2W M 3M
6M A Notes
Item Description
Qty Notes
Clean control panel, batteries and chargers
Check the charger input and output voltage
Check the mains failure by disconnecting the battery.
Check the deflective circuit
Check the alarm circuit
Put of system and calibrate the sensitivity of the detectors and clean all detectors
Clean all bells and sounder
Put the system on and check the lamps.
Check cylinder pressure , if needed arrange for filling.
Fire alarm function test
Check nozzles, clean , if necessary
Replace all the defective parts
Notes
Use additional sheets if required
PPM routines based on Complete
Running hour where recommended by the Manufacturer
http://www.sitei.net/up/do.php?id=50
في أمان الله !
Attachments
-
114.5 KB Views: 959