الحمد لله والصلاة والسلام على رسول الله وعلى آله وصحبه أجمعين
EQUIPMENT DETAILS Fire Fighting Equipment
SCHEDULE OF PLANNED PREVENTIVE MAINTENANCE Work Plan
SCHEDULES OF PLANNED PREVENTATIVE MAINTENANCE Work Plan
EQUIPMENT DETAILS Fire Fighting Equipment
صيانة دورية جداول جاهزة نظام معدات و أجهزة مكافحة الحريق
جاهزة للتحميل و سهلة التعديل و الطباعة مايكروسوفت وورد ملفات
EASY AND READY TO BE DOWNLOADED , MODIFIED AND PRINTED
MICROSOFT WORD DOCUMENTS
Capacity
Qty: Lot
Make & Model
Location
Fire Fighting Equipment
Task Description
W / Weekly M / Monthly Q / Quarterly SA/ Semi/Annually
A/ Annually SST / Seasonal Start/Up SSH / Season Shut Down
2W M 3M
6M A Notes
Item Description
Qty Notes
Critical Tasks, to be performed
Check water pressure in the net.
Blow down water through each hose for 3 minutes and test for pressure.
Test nozzle, valves and hose reel.
Check all valves for action on free travel.
Other recommended tasks
Test nozzle valves and hose reels.
Check all portable extinguisher for leak and arrange to refill them, if necessary
Inspect fire extinguisher for position and damage
Clean paint piping wherever corroded.
Notes
Use additional sheets if required
PPM routines based on Complete
Running hour where recommended by the Manufacturer
http://www.sitei.net/up/do.php?id=89
! في أمان الله
Attachments
-
112 KB Views: 883