EQUIPMENT DETAILS Fire Alarm, Halon, Deluge Systems & Fm 200
SCHEDULE OF PLANNED PREVENTIVE MAINTENANCE Work Plan
SCHEDULES OF PLANNED PREVENTATIVE MAINTENANCE Work Plan
EQUIPMENT DETAILS Fire Alarm, Halon, Deluge Systems & Fm 200
صيانة دورية جداول جاهزة نظام نذار الحريق
جاهزة للتحميل و سهلة التعديل و الطباعة مايكروسوفت وورد ملفات
EASY AND READY TO BE DOWNLOADED , MODIFIED AND PRINTED
MICROSOFT WORD DOCUMENTS
Capacity
Qty: Lot
Make & Model
Location
Fire Alarm, Halon, Deluge Systems & Fm 200
Task Description
W / Weekly M / Monthly Q / Quarterly SA/ Semi/Annually
A/ Annually SST / Seasonal Start/Up SSH / Season Shut Down
2W M 3M
6M A Notes
Item Description
Qty Notes
Critical Tasks to be performed
Clean control panel, batteries & charger
Check the battery voltage
Check the charger input and output voltage
Check the mains failure by disconnecting main power
Check the battery failure by disconnecting the battery
Put the system on and check the lamps
Activate (test) the detector and bill
Check gas cylinder pressure
Check the electrolyte level and gravity
Check the charging current
Calibrate the charger, if necessary
Check the detections circuit
Check the alarm circuits
Put off the system and clean all detectors
Other recommended tasks
Clean all the bills and sounders
Check the detection fault removing the detector
Check the alarm circuit fault by removing the bell and sounder
Replace all the defective parts
Notes
Use additional sheets if required
PPM routines based on Complete
Running hour where recommended by the Manufacturer