الحمد لله والصلاة والسلام على رسول الله وعلى آله وصحبه أجمعين
EQUIPMENT DETAILS Elevators Monthly maintenance
SCHEDULE OF PLANNED PREVENTIVE MAINTENANCE Work Plan
SCHEDULES OF PLANNED PREVENTATIVE MAINTENANCE Work Plan
EQUIPMENT DETAILS Elevators Monthly maintenance
صيانة دورية جداول جاهزة نظام مصاعد
جاهزة للتحميل و سهلة التعديل و الطباعة مايكروسوفت وورد ملفات
EASY AND READY TO BE DOWNLOADED , MODIFIED AND PRINTED
MICROSOFT WORD DOCUMENTS
Capacity
Qty: Lot
Make & Model
Location
Elevators Monthly maintenance
Task Description
W / Weekly M / Monthly Q / Quarterly SA/ Semi/Annually
A/ Annually SST / Seasonal Start/Up SSH / Season Shut Down
2W M 3M
6M A Notes
Item Description
Qty Notes
Critical Tasks to be performed
Check start smooth run and slowing with levels
Check noise cracking, if any
Check the interior car condition
Check all landing and car door cell groove cleaning
Check door shoe abrasion and fixing condition
Other recommended tasks
Check rotating condition of car and counter weight
Lubricate slider guide rails
Inspect rotating condition of governor and pulleys
Check door closing and opening operation
Check door closing and opening timings
Check friction of push button, spoiled of operation
board and covering condition
Check all hall button condition and all button lamps
Notes
Use additional sheets if required
PPM routines based on Complete
Running hour where recommended by the Manufacturer
http://www.sitei.net/up/do.php?id=114
! في أمان الله
Attachments
-
178 KB Views: 882