الحمد لله والصلاة والسلام على رسول الله وعلى آله وصحبه أجمعين
EQUIPMENT DETAILS Elevators MACHINE ROOM
SCHEDULE OF PLANNED PREVENTIVE MAINTENANCE Work Plan
SCHEDULES OF PLANNED PREVENTATIVE MAINTENANCE Work Plan
EQUIPMENT DETAILS Elevators MACHINE ROOM
صيانة دورية جداول جاهزة نظام مصاعد
جاهزة للتحميل و سهلة التعديل و الطباعة مايكروسوفت وورد ملفات
EASY AND READY TO BE DOWNLOADED , MODIFIED AND PRINTED
MICROSOFT WORD DOCUMENTS
Capacity
Qty: Lot
Make & Model
Location
Elevators MACHINE ROOM
Task Description
W / Weekly M / Monthly Q / Quarterly SA/ Semi/Annually
A/ Annually SST / Seasonal Start/Up SSH / Season Shut Down
2W M 3M
6M A Notes
Item Description
Qty Notes
Critical Tasks to be performed
Inspect all equipments in machine room, clean machine room & machine
Check machine room, machine , controller and selector , clean if necessary
Check operation of machine, notice noise vibration
Check oil leakages in machine
Check gear oil and bearing oil levels
Check magnetic brake operation
Check fuses for proper size in controller
Check operation of timed relays and set/ reset relays
Check condition and alignment of relays and switch contacts
Check for loose wiring connections
Check sequence of operation
Other recommended tasks
Inspect all equipment on selector and lubricate , clean if necessary
Check carbon contacts
Check controller and selector Relay leads
Notes
Use additional sheets if required
PPM routines based on Complete
Running hour where recommended by the Manufacturer
http://www.sitei.net/up/do.php?id=108
! في أمان الله
Attachments
-
181.5 KB Views: 741