EQUIPMENT DETAILS COOLING TOWERS Annual PREVENTIVE MAINTENANCE

Mannan

Administrator
Staff member
#1


proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D3&hash=ae866cb1b633706ea853d3841bcbc208


proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D4&hash=b63a662fc34192936ec29f3cd1a1fec2



الحمد لله والصلاة والسلام على رسول الله وعلى آله وصحبه أجمعين



EQUIPMENT DETAILS COOLING TOWERS Annual PREVENTIVE MAINTENANCE


SCHEDULE OF PLANNED PREVENTIVE MAINTENANCE Work Plan


SCHEDULES OF PLANNED PREVENTATIVE MAINTENANCE Work Plan


proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D145&hash=cdf053965d5b62e635e85f55f2066bfe


EQUIPMENT DETAILS COOLING TOWERS Annual PREVENTIVE MAINTENANCE

صيانة دورية جداول جاهزة نظام بوابات الدخول المؤمنة

جاهزة للتحميل و سهلة التعديل و الطباعة مايكروسوفت وورد ملفات

EASY AND READY TO BE DOWNLOADED , MODIFIED AND PRINTED

MICROSOFT WORD DOCUMENTS TECHNICAL DATA SCHEDULES

Capacity
Qty: Lot
Make & Model

Location

COOLING TOWERS Annual PREVENTIVE MAINTENANCE During shut down season


Task Description
D / Daily W / Weekly M / Monthly Q / Quarterly SA/ Semi/Annually
A/ Annually SST / Seasonal Start/Up SSH / Season Shut Down
2W M 3M
6M A Notes

Item Description
Qty Notes

Critical Tasks to be performed

Drain cooling tower sump and clean basin
Change gearbox oil
Clean cooling towers and sump, inspect and repair as necessary: woodwork, plastic work, valves, spray nozzles, fans, pipe work and repair any cracks in the basin
Paint woodwork if applicable, with suitable preservative
Check and adjust fan blade pitch angle of the cooling tower, if applicable
Check bearing and change if necessary
Remove and clean eliminators and fills
Overhaul all valves and lubricate spindles
Check bearing bolts, fan anti-vibration mountings, tighten or replace if necessary
Inspect, repair or replace as necessary all electrical works

Other recommended tasks


Inspect all cooling tower inlet louvers and replace if necessary
Clean fan guard and cover; check cover for tightness and paint
Paint the cooling tower
Inspect fill tile for foreign debris
Check motors and starters
Check alignment of fan shaft coupling
Insulation test for all electrical motors
Change screen in basin if necessary


Notes
Use additional sheets if required
PPM routines based on Complete
Running hour where recommended by the Manufacturer


proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D6&hash=e694c7d9a3c445d7e5187539c644951d


http://www.sitei.net/up/do.php?id=146

or you can download from attachments