الحمد لله والصلاة والسلام على رسول الله وعلى آله وصحبه أجمعين
EQUIPMENT DETAILS Condenser Water Pumps
SCHEDULE OF PLANNED PREVENTIVE MAINTENANCE Work Plan
EQUIPMENT DETAILS Condenser Water Pumps
Capacity
صيانة دورية جداول جاهزة مضخات ماء المكثف الحار
Qty: Lot
Make & Model
Location
Annual Requirements to Short Life
Consumable Spare Parts
Task Description
W / Weekly M / Monthly Q / Quarterly SA/ Semi/Annually
A/ Annually SST / Seasonal Start/Up SSH / Season Shut Down
2W M 3M
6M A Notes
Item Description
Qty Notes
Clean inside pump casing and epoxy coat
Inspect unit for unusual noise and/or vibration, ensure that it is in good working order
Provide lubrication, if necessary.
If unit is not running or an identified problem requires the unit to be serviced
perform ALL Non-Critical Tasks listed below
Check the operation and abnormal noise/sound Level
Check gland and mechanical seals for leakage
Check and clean strainer
Check and grease the pump bearing
Check the coupling wear
Check the alignment
Paint if necessary
Change pump packing
Check mechanical seal for leaks, change if necessary
Flush and clean strainers.
Check operation of gauges and record pressures and temperatures
Inspect seals and packing, tighten or replace as necessary
Lubricate impeller shaft bearings
Inspect motor and pump alignment
Other recommended tasks
Inspect mounting bolts and vibration isolators of the pump under load conditions
Start and stop pump, noting any vibration and overall performance
Inspect drive shaft coupling.
Notes :
Use additional sheets if required
PPM routines based on Complete
Running hour where recommended by the Manufacturer
http://www.sitei.net/up/do.php?id=16
في أمان الله !
Attachments
-
150 KB Views: 641
Last edited: