What's new
SCHEDULES OF PLANNED PREVENTIVE MAINTENANCE CHECKLISTS

Planned Preventive Maintenance checklists , EASY AND READY TO BE DOWNLOADED , MODIFIED AND PRINTED MICROSOFT WORD DOCUMENTS W Weekly M Monthly Q Quarterly SA Semi/Annually A Annually SST Seasonal Start Up SSH Season Shut Down . No Registeration Needed!

EQUIPMENT DETAILS Central Control Station PREVENTIVE MAINTENANCE

Mannan

Administrator
Staff member
#1


proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D3&hash=ae866cb1b633706ea853d3841bcbc208


proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D4&hash=b63a662fc34192936ec29f3cd1a1fec2


الحمد لله والصلاة والسلام على رسول الله وعلى آله وصحبه أجمعين



Central Control Station PREVENTIVE MAINTENANCE


SCHEDULE OF PLANNED PREVENTIVE MAINTENANCE Work Plan


SCHEDULES OF PLANNED PREVENTATIVE MAINTENANCE Work Plan


proxy.php?image=https%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D205&hash=6abcfeb6e6cb95f4570146f29880fc6b


EQUIPMENT DETAILS Central Control Station PREVENTIVE MAINTENANCE

صيانة دورية جداول جاهزة وحدة التحكم المركزية

جاهزة للتحميل و سهلة التعديل و الطباعة مايكروسوفت وورد ملفات

EASY AND READY TO BE DOWNLOADED , MODIFIED AND PRINTED

MICROSOFT WORD DOCUMENTS TECHNICAL DATA SCHEDULES

Capacity
Qty: Lot
Make & Model

Location

Central Control Station PREVENTIVE MAINTENANCE

Task Description
D / Daily W / Weekly M / Monthly Q / Quarterly SA/ Semi/Annually
A/ Annually SST / Seasonal Start/Up SSH / Season Shut Down
2W M 3M
6M A Notes

Item Description
Qty Notes

Critical Tasks to be performed

1- Check that the Central Control Station is installed within the protective area
2- Check that the interconnecting wiring between computers and peripherals are securely connected
3- Check that all peripherals are provided and according to approved equipment submission
4- Check the database associated with each input point has been provided
5- Check detailed floor plan with positions of security devices has been provided correctly

Other recommended tasks

6- Check alarm buzzer, alarm visual indicators, and reset function are in proper working order
7- Check Computers and peripherals are fixed and not subject to vibration
8- Check Computers and peripherals are clean and no sign of damage and tampering
9- Check Telephone number of maintenance teams are provided at visible position
10- Check Maintenance record card are provided and stored in specified drawer of the console.
11- Check Operator handbook are provided and stored in specified drawer of the console
12- Check drawings and manuals are provided in a secured drawer with security device in the Control Console.
13- Check Additional items if required

Notes
Use additional sheets if required
PPM routines based on Complete
Running hour where recommended by the Manufacturer

proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D6&hash=e694c7d9a3c445d7e5187539c644951d


https://www.sitei.net/up/do.php?id=204

or you can download from attachments
No registration required

! في أمان الله



proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D5&hash=acaedc343055116a139b8f0cbf6d6ab6


 

Attachments

Top